EXP-09 · Build·Technology
Hemp in the Drawing Set
A building is decided at three desks: the model, the carbon report and the tender. Hemp is missing from all three, so it loses before anyone argues about it. Three tools that put it there, built on one product record so each tool tells the same truth.
FROM RECORD
A1The foundation the three tools share
One hemp product record, seen three ways
Materials are chosen inside software, and hemp wins when it is the easiest option there. Three tools with three versions of the facts is how specifiers learn to distrust a material. So the BIM object, the carbon dataset and the clause library are three renderings of one record, and none of them can say more than it does.
A1One hemp product record, seen three ways
A1General notes
- No number without a document. A value with no EPD, FDES, test report or technical approval behind it is not shown in any tool.
- An expired declaration greys out everywhere at once. The BIM object, the calculator and the clause library all show it as expired the same day.
- Biogenic carbon appears only where the product's EPD declares it, and always separately from fossil emissions (EN 15804+A2 reports them as separate indicators).
- Generic objects (no manufacturer) exist for early design. They carry conservative ranges and say so in their name.
- Hemp'in publishes the record. It never certifies the product. Certification stays with the bodies that issue it.
A1What the record holds
| Field group | What it holds | Where the value comes from | Used by |
|---|---|---|---|
| identity | Manufacturer, product name, family (cast hempcrete, block, batt, board, render), country of manufacture | Claimed company page; verification tier T0 to T3 | A2 · A3 · A4 |
| performance | Thermal conductivity λ, density, specific heat, vapour resistance μ, reaction to fire (Euroclass), acoustic data where tested | Declaration of performance, test reports, technical approvals | A2 · A3 · A4 |
| environment | EPD or FDES id, programme operator, standard (EN 15804+A2), validity, GWP-fossil and GWP-biogenic by module, RE2020 StockC where declared | INIES (FDES) for France; ECO Platform EPDs elsewhere | A2 · A3 |
| execution | Execution rules followed (for France, the professional rules for hempcrete), applicator training, insurance class where known | Construire en Chanvre rules, trade bodies, the applicator's own page | A4 |
| provenance | Link to the lot's Hemp Passport, legality at origin and destination, evidence tier | Hemp Passport; Atlas legality | A2 · A4 |
| presence | Where it is installed: projects, m², tenders won (from the public tender feed) | Company page, tender feed, Stored Carbon Ledger | A3 · A4 |
A1Evidence tiers, and what each one unlocks
| Tier | What it means | Record | BIM object | Calculator | Clause | Named in a market check |
|---|---|---|---|---|---|---|
| Declared | The manufacturer typed it in. Shown with a "declared" mark. | ● | ● | ○ | ○ | ○ |
| Documented | A document is attached and Hemp'in has checked the value matches it: an EPD, an FDES, a test report. | ● | ● | ● | ● | ○ |
| Verified | The document is third-party verified and in date, and the company page is T2 or above. | ● | ● | ● | ● | ● |
A2Tool 1 · for architects
Hemp objects in the BIM library
Architects specify what is already in the library. When a hempcrete wall type has to be modelled by hand from a PDF, a bio-based option costs an afternoon a conventional one does not. The library removes that afternoon. Pick an object: it becomes the record every tool on this page reads.
A2BIM tool › Add-ins › Hemp'in objects
Open IFC, so it works in any BIM tool. Open licence with attribution: a paid tier is never needed to download a hemp object.
◇Hempcrete wall, cast on timber frame, 300 mm
Pset_WallCommon
Pset_MaterialThermal
Hempin_Record
◇1 · Wall types
Hempcrete cast or sprayed around a timber frame, hempcrete block walls, hemp insulation in a timber frame.
◇2 · Layers and materials
Hemp-lime render, hemp fibre batts and boards, so they can be used in any assembly.
◇3 · Generic, then product
A generic object for sketch design, then the specific product at tender stage, linked to its record.
◇4 · Open IFC first
Standard IFC property sets plus one Hemp'in set that points back to the record, so a model checker or a take-off can follow the link.
A3Tool 2 · for architects and LCA consultants
The whole-life carbon calculator
From 1 January 2028, new EU buildings over 1,000 m² must calculate and disclose life-cycle global warming potential; from 2030, all new buildings. The method decides how good hemp looks, so the screen always shows all three methods side by side, on one scale.
A3hempin.org › tools › carbon › compare walls
A3EN 15978 · static (−1/+1)
Carbon the plant took up is counted in, then counted out at end of life, so biogenic carbon nets to zero. Hemp wins here on low fossil emissions alone.
A3RE2020 · dynamic LCA
Each emission and each year of storage is weighted by when it happens. Fifty years of carbon held in the wall counts, so the green segment reduces the total.
A3Stored carbon · reported apart
Not an emission figure. The carbon physically stored in the wall for its life, as the product FDES declares it. This is what the Stored Carbon Ledger records. It is never sold as a credit.
≡Legend
ΣScale it to a facade
| Wall | Static · t CO₂e | Dynamic · t CO₂e | Stored · t CO₂ |
|---|---|---|---|
| A · Hempcrete on timber frame | 60 | -7 | 87 |
| B · Concrete block + EPS | 148 | 148 | 0 |
| C · Timber frame + mineral wool | 80 | 63 | 22 |
EPBDDisclosure check
Required from 1 Jan 2028
4,200 m² is over the 1,000 m² threshold: life-cycle GWP goes on the energy certificate, per module, in kg CO₂e/m² over the study period.
The reporting unit and study period as transposed in France are still to verify Verify
✓Hemp check on this comparison
×What this screen never shows
A carbon credit, a price per tonne, or a “carbon negative” badge.
If the static method shows net emissions, the screen says so, even for hemp. Showing all three methods side by side is how the tool earns trust from LCA consultants who know the debate.
↗Ships as
A data feed for existing tools
Hemp product records as machine-readable EPD data in the formats LCA tools import, and as FDES links for RE2020 software. The architect never leaves the tool they already use.
↗Ships as
The comparison screen
This screen, free and public, for sketch design and for public buyers writing a brief. It answers one question: what does hemp change, by each method?
↗Ships as
The disclosure note
A one-page export a design team attaches to its report: assemblies, data sources, method and tier for each value.
A4Tool 3 · for public buyers
The BUD spec writer
A relaunch does not prove no supplier exists; it proves the buyer wanted hemp and did not get it. BUD drafts performance-based clauses, because EU procurement law does not let a buyer name a brand, a process or an origin without “or equivalent”. A lot that asks for low fossil carbon, stored biogenic carbon and a vapour-open wall is a lot hemp can win in open competition.
A4hempin.org › tools › spec writer › new lot
Award weights · the buyer sets them
§Draft clauses · Lot 3
Le complexe de façade présente une résistance thermique R ≥ 4,0 m².K/W, une paroi ouverte à la diffusion de vapeur d'eau de l'intérieur vers l'extérieur, et un classement de réaction au feu conforme à la réglementation applicable à l'établissement.
Le complexe de façade intègre des matériaux biosourcés pour une quantité minimale de [X] kg par m² de paroi, justifiée par les fiches techniques des produits, ou équivalent.
La mise en œuvre est réalisée selon les règles professionnelles d'exécution des ouvrages en béton de chanvre ou tout référentiel technique équivalent, par une entreprise justifiant d'une formation ou de références équivalentes.
Le titulaire fournit, pour chaque produit du complexe, une FDES (base INIES) ou une déclaration environnementale conforme à la norme NF EN 15804+A2, en indiquant séparément le carbone biogénique.
Les variantes sont autorisées sur la nature du liant et le mode de mise en œuvre (projeté, banché, blocs), sous réserve du respect des exigences minimales des articles 3.1 à 3.4.
Prix 50 %. Valeur technique 30 %. Performance environnementale 20 % : impact carbone du complexe de façade en kg éq. CO₂ par m² de paroi, calculé selon NF EN 15978 sur 50 ans, modules A à C ; le stockage de carbone biogénique est déclaré séparément et évalué au titre de la valeur technique.
?Add a requirement · BUD checks it
◎Market check · from the registry
Named as an example: HMP-W-300, Verified and in date.
Before you publish: applicators near you are small firms. Keep the hempcrete façade as its own lot rather than inside general works, allow a variant on the binder, and leave time for drying. The relaunched lot like yours had a four-week window for a cast-in-place façade.
What this lot would store: about 1,400 m² of hemp-lime façade. With a typical product's FDES that is a stored-carbon range, not a single number, and it joins the public count of what tenders would store in hemp once the lot is awarded.
×BUD will not
TTest plan: five real tenders
Pick five lots
From the tender feed, including at least two of the eight relaunched ones. The Marseille school façade lot is the obvious first case.
Read each notice
Learn which ground for “unsuccessful” applied: no bid, irregular, unacceptable or over budget. That decides what the redraft fixes.
Redraft and review blind
BUD redrafts each lot. Two procurement officers and one procurement lawyer review the drafts blind, against the original.
A5How the three tools join the rest
The loop, and the path to 2028
A5The loop
A5The path to 2028
Phase 1 · now to Dec 2027: Spec writer first
- It rides on the tender feed, which is already live.
- The product record, built for the certified French products only.
- Five-tender test, then free for French buyers.
- Comparison screen in its first, public form.
A5How we know it works
| Tool | Working | Not working |
|---|---|---|
| Spec writer | Drafted lots get at least one compliant bid more often than the feed's relaunch base rate | Reviewers rewrite most clauses, or buyers use it once and leave |
| BIM objects | Downloads lead to the product's record being opened from a model, and to tenders naming that product type | Objects are downloaded but the record is never opened from a model |
| Carbon calculator | Design teams cite Hemp'in data in disclosure notes; consultations cite the evidence pack | LCA consultants dispute the method screen; we change it, publicly |
| All three | The north star moves: verified tonnes of hemp placed in long-lived products, and m² on the Stored Carbon Ledger | |
A6Every claim on these sheets, sorted
What we know, what to check, what does not exist yet
Checked 30 October 2026.
●Sourced
- EPBD recast Art. 7: life-cycle GWP disclosure from 2028 for new buildings over 1,000 m², all new buildings from 2030 Sourced
- 108 EU procedures naming hemp since 2024, 8 relaunched (Hemp'in tender feed, Oct 2026) Sourced
- Hempcrete can store up to 16 kg CO₂/m² net; a cement-heavy mix still emitted 8.16 kg CO₂/m² (Arehart et al. 2020, via Carbon Leadership Forum) Sourced
- RE2020 uses dynamic LCA; StockC is a reported, non-regulatory indicator in kg C/m² Sourced
- Code de l'environnement L228-4: bio-based or low-carbon materials in at least 25% of heavy renovations and public construction from 2030 Sourced
!To verify before anyone quotes it
- Whether the L228-4 implementing decree has been published, and whether bills moving the date have passed Verify
- Exact French procurement article numbers for “no brand or origin” and variants, before BUD cites them (Directive 2014/24 Arts 42, 43, 45 and 67 are the EU basis) Verify
- Which French hemp products hold valid FDES today, and how many. That count sets the first BIM release Verify
- EPBD Annex III reporting unit and study period as transposed in France Verify
- Every number in the A3 charts and the market check. They show the screens, not the market Sample data
○Does not exist yet
- The hemp product record as a data object. Company pages and tiers exist; product-level EPD fields do not No data
- Any BIM object, calculator screen or spec writer. This page is the design No data
- A procurement lawyer or LCA partner to review the clauses and the method screen Open question
- A standardised hempcrete LCA. The evidence bounties are where that comes from Open question
?Open decision 1
France first, alone?
Leaning · Yes
RE2020, INIES and the tender feed's French majority make France the only market where all three tools have data on day one. Other markets wait for the feed to show demand.
?Open decision 2
Partner for the clauses, or ship drafts with a disclaimer?
Leaning · A named procurement-law partner first
A buyer trusts a clause a lawyer has read; BUD alone is a draft.
?Open decision 3
Feed existing calculators, or build our own?
Leaning · Feed them
The comparison screen stays small and public; the volume goes through the tools design teams already use.